How Much Does a Bricklayer Cost in the UK? 2026 Prices

Short answer

A skilled bricklayer in the UK typically costs £220–£320 per day in 2026, with labourers and materials on top. Priced by the job, a one-metre-high garden wall costs around £180–£350 per metre, repointing £40–£80 per m², crack stitching £80–£150 per metre and a chimney stack rebuild £1,500–£4,000. Extension brickwork shells start from around £6,000. Bricks, mortar type, access and scaffolding drive the final price.

How Much Does a Bricklayer Cost in the UK? 2026 Prices

Guide prices for 2026

Bricklaying is priced in a few different ways. Small repairs and odd jobs are often charged by the day. Garden walls are usually priced per metre run at a given height. Repointing is priced per square metre of wall face. Larger jobs, such as extensions, are quoted as a fixed price for the whole job, sometimes worked out from a rate per thousand bricks.

The table shows typical 2026 prices across the UK. Rates in London and the South East tend to sit at the top of each range or above it, and rates in parts of the North, Wales and Scotland often sit lower. A contractor confirms one fixed price after seeing the site.

JobGuide priceWhat is included
Bricklayer day rate£220–£320 per daySkilled bricklayer; labourer and materials extra
Garden wall, one metre high£180–£350 per metreFoundation, frost-resistant bricks, DPC, coping
Repointing£40–£80 per m²Raking out and repointing; lime and scaffolding add cost
Crack stitching£80–£150 per metreHelical bars grouted into raked joints, repointed
Chimney stack rebuild£1,500–£4,000Rebuild above roof line, flaunching, pots; scaffold often extra
Extension brickwork shellfrom £6,000Cavity walls for a single-storey rear extension

Day rate or fixed price

Day rates suit small or uncertain jobs, such as rebuilding a short run of collapsed wall, resetting a few coping stones or patching damaged brickwork where it is hard to know the extent until work starts. You pay for the time taken, plus materials and a labourer if one is needed.

For anything with a clear scope, a fixed price is usually better for the customer. You know the total before work starts, and the contractor carries the risk of the job taking longer than planned. A good fixed quote lists the length, height and thickness of walls, the bricks and mortar to be used, the foundation design, and whether waste removal, scaffolding and skips are included.

What pushes the price up

Materials are a big variable. Standard machine-made facing bricks are the cheapest. Handmade, reclaimed and special-shaped bricks can cost several times more, and matching old brickwork often means hunting through reclaim yards. Lime mortar costs more than cement in both materials and time, because it is mixed and laid more carefully and must be protected while it cures.

Access and height come next. Work above head height needs scaffolding or towers, which can add hundreds of pounds even for a short job. Chimneys almost always need scaffolding. Gardens with no side access mean bricks, sand and mortar are carried through the house, which slows the job down.

  • Quantity of brickwork and depth of foundations.
  • Brick type: standard, handmade, reclaimed or special shapes.
  • Mortar: lime takes longer and needs protection while curing.
  • Access, scaffolding and carrying materials through the house.
  • Detail: piers, curves, arches, decorative bonds and matching old work.
  • Waste removal and skips.

Worked examples

A homeowner replacing a 10m front garden wall, one metre high, in standard facing bricks with a brick-on-edge coping might expect around £1,800–£3,500, depending on foundations and access. Adding two piers and a gate opening increases the total.

Repointing the front of a typical two-storey terraced house, with around 40m² of wall face in lime mortar, could cost roughly £1,600–£3,200 for the pointing, plus scaffolding. A chimney stack rebuild on the same house, with new flaunching and pots, would usually be a separate item at £1,500–£4,000, with scaffolding shared if both jobs are done together.

Example jobApproximate cost
10m garden wall, one metre high£1,800–£3,500
Repointing 40m² front elevation£1,600–£3,200 plus scaffolding
5m of crack stitching£400–£750
Small brickwork repair, one day£220–£320 plus materials

Ways to keep costs down

Group jobs that need the same access. If scaffolding is going up for a chimney, it makes sense to repoint high-level brickwork, fix the fascias and clear gutters at the same time. Choosing a readily available brick that suits the house, rather than a rare reclaimed one, can save a lot on a new wall, especially if it is not right next to old brickwork.

Be clear about what you want before asking for quotes. Measure the wall, take photos of the existing brickwork and note any problems you have seen, such as cracks or damp. Contractors can then price accurately rather than adding a margin for the unknown.

Timing can help as well. Bricklayers are often busiest in spring and summer, when the weather suits mortar work. Booking early, or being flexible on start dates, makes it easier to get your preferred contractor without paying a premium for a rushed slot.

Comparing quotes

When quotes differ widely, check whether they cover the same work. One contractor may include a deeper concrete foundation and engineering bricks below ground, while another assumes the old footing can be reused. One may price lime mortar on an old house, another cement. The cheaper quote is not always wrong, but you should understand why it is cheaper.

Ask whether Building Regulations, a party wall notice or listed building consent apply, and who will handle them. For extensions, building control or a registered building control approver will need to inspect the work.

Look at how the quote handles the unexpected. A good contractor explains what happens if the old foundation turns out to be unsound, or if more bricks are loose than expected once work starts, and how any extra would be priced. That conversation up front avoids disputes later.

Questions people also ask

How much does a bricklayer charge per day?

A skilled bricklayer typically charges £220–£320 per day in the UK in 2026, with London and the South East at the higher end or above. Labourers are charged separately, and materials are extra. For jobs with a clear scope, a fixed price for the whole job is often better value and gives you certainty.

Is it cheaper to pay a bricklayer per day or per job?

For small, uncertain repairs, a day rate can be fair because you pay only for time spent. For walls, extensions and repointing with a clear scope, a fixed price is usually better. You know the total before work starts, and the contractor carries the risk if the job takes longer than planned.

Does a bricklaying quote include scaffolding?

Not always. Scaffolding is often priced separately, especially for chimneys and upper-floor repointing, and can add a significant amount to the job. Ask each contractor whether scaffolding, skips, waste removal and materials are included so that you compare like with like.

Written and checked by the Bricklaying Contractors team. Read our editorial policy.