Guide · Homeowners · 4 min read · Updated 17 November 2026
Party Wall Act and Brickwork: When You Need to Notify Neighbours
Short answer
In England and Wales, the Party Wall etc. Act 1996 requires you to give your neighbour written notice before building a new wall on or astride the boundary, working on an existing party wall, or digging foundations within 3 metres, and in some cases 6 metres, of their building below the level of their foundations. Notice periods are one or two months depending on the work, and disagreements are settled by party wall surveyors.
What the Party Wall Act covers
The Party Wall etc. Act 1996 applies in England and Wales. It sets out a process for building work that affects a shared wall, a wall on the boundary or a neighbour's foundations. The aim is to let building owners carry out work while protecting the neighbour's property. It does not replace planning permission or Building Regulations, which are separate.
Scotland and Northern Ireland do not have the same Act, and work near boundaries there follows different rules and common law. Owners in those areas should check the local position.
Types of work and notice periods
The Act covers three main situations. Each needs a different notice, served in writing before the work starts.
| Type of work | Example | Minimum notice |
|---|---|---|
| New wall on the line of junction | A new boundary wall or extension wall on the boundary | One month |
| Work to an existing party wall | Cutting in for beams, raising, rebuilding or underpinning a shared wall | Two months |
| Adjacent excavation | Digging foundations within 3m of a neighbour's building and deeper than its foundations | One month |
How it applies to bricklaying jobs
Many bricklaying jobs are affected. A rear extension built right up to the boundary, with its wall on the line of junction, needs a notice. So do extension foundations dug close to a neighbour's house, which often fall within the 3 metre rule. Raising a shared garden wall, rebuilding a party wall or cutting into a shared chimney breast to remove it are also covered.
Small repairs to your side of a party wall, such as repointing or replacing a few bricks, usually do not need notice, as long as they do not affect the structure. Building a garden wall entirely on your own land, set back from the boundary, does not need a line of junction notice, although an adjacent excavation notice could still apply if the foundations are deep and close to a neighbour's building.
- Extension walls on the boundary.
- Foundations close to a neighbour's building.
- Raising or rebuilding a shared wall.
- Cutting into a party wall for beams or flashings.
- Removing shared chimney breasts.
What happens after notice is served
Once notice is served, the neighbour has 14 days to respond. They can agree in writing, or they can dissent. If they do not respond within 14 days, a dispute is treated as having arisen. When there is a dispute, the owners either appoint one agreed surveyor or each appoint their own, and the surveyors agree a party wall award. The award sets out what work can be done, how and when, and usually records the condition of the neighbour's property beforehand.
The building owner normally pays the surveyors' reasonable fees. Getting the notice right and talking to neighbours early often leads to written consent and avoids the cost of surveyors.
Practical tips
Allow enough time. With notice periods of one to two months, plus time for any award, party wall matters can hold up a project if they are left late. Serve notices as soon as your plans are firm. Talking to your neighbour before sending anything formal usually helps, as does giving them a copy of the drawings.
Your bricklaying contractor should tell you if a job looks likely to need notice, but responsibility for serving it sits with the building owner. Free template notices are available from government guidance, or a party wall surveyor can prepare and serve them for you.
- Serve notice as soon as plans are fixed.
- Speak to neighbours first and share drawings.
- Keep photos of the neighbour's side before work starts.
- Do not start notifiable work until the process is complete.
What a notice should include
A party wall notice must be in writing and include the building owner's name and address, the address of the building where the work will happen, a description of the proposed work and the date it is planned to start. For adjacent excavations, the notice should be accompanied by plans and sections showing the location and depth of the excavation and any proposed foundations.
If the property has more than one owner, such as a freeholder and a long leaseholder, each may need to be served. Notices can be delivered by hand or post, and in some cases electronically if the neighbour has agreed to that. Keep copies and a note of when and how each notice was served.
Notices do not last for ever. A party structure or excavation notice lapses if the work has not started within 12 months of it being served, and a fresh one is then needed. That matters for projects that are delayed by planning, finance or contractor availability.
Party wall surveyors and awards
If a dispute arises, the surveyors prepare a party wall award. This is a legal document that sets out the work allowed, how it should be carried out, working hours, access arrangements and any protective measures. It normally includes a schedule of condition of the neighbour's property, with photographs, so any later damage can be identified. The award can be appealed to the county court within 14 days of being served.
Surveyors act impartially under the Act, even when appointed by one side. Their role is to resolve matters fairly, not to argue for whoever appointed them. A well-written award usually makes the build smoother for everyone, including the bricklaying contractor.
Questions people also ask
Do I need a party wall agreement to build a garden wall?
If you build a new garden wall on or astride the boundary line in England or Wales, you need to serve a line of junction notice under the Party Wall etc. Act 1996 at least one month before starting. If the wall is entirely on your land and set back from the boundary, notice is usually only needed if deep foundations are close to a neighbour's building.
What happens if I do not serve a party wall notice?
If you start notifiable work without serving notice, your neighbour can seek a court injunction to stop the work and may claim for any damage caused. It can also complicate selling the property later. Serving notice correctly protects both sides and is a legal requirement for work covered by the Act.
Who pays for the party wall surveyor?
The building owner, the person carrying out the work, normally pays the reasonable fees of both the agreed surveyor or both surveyors if each side appoints one. If the neighbour consents in writing, no surveyor is needed, which saves cost.
Written and checked by the Bricklaying Contractors team. Read our editorial policy.
More guides
How Much Does a Bricklayer Cost in the UK? 2026 Prices
A skilled bricklayer in the UK typically costs £220–£320 per day in 2026, with labourers and materials on top. Priced by the job, a one-metre-high…
How a Brick Garden Wall Is Built: Foundations, DPC and Coping
A well-built brick garden wall sits on a concrete strip foundation dug below frost depth, typically at least 450mm and deeper on clay or near trees.…
Repointing Brickwork: When It Is Needed and Lime vs Cement
Brickwork needs repointing when mortar joints are crumbling, recessed or missing, letting water into the wall. Good repointing rakes the old mortar…
Cracks in Brick Walls: Causes, When to Worry and How They Are Fixed
Cracks in brick walls are caused by movement, such as subsidence, heave, tree roots, leaking drains, thermal expansion, failed lintels or rusting…